1
I Use This!
Very High Activity

Commits : Listings

Analyzed 1 day ago. based on code collected 2 days ago.
Nov 13, 2025 — Nov 13, 2026
Commit Message Contributor Files Modified Lines Added Lines Removed Code Location Date
mcp: eval todo waits for function text and detects sharing by identity More... about 2 months ago
Merge remote-tracking branch 'origin/main' into claude/mcp-eval-tool More... about 2 months ago
todo: thread one CAS through the session sketch; keep params optional More... about 2 months ago
Merge remote-tracking branch 'origin/main' into claude/vigilant-lovelace-p13j1z More... about 2 months ago
effects/node: scope "the header is the bound the reads stop at" to the handle
t
More... about 2 months ago
mcp: eval todo leaves oversized results to the transport More... about 2 months ago
Merge remote-tracking branch 'origin/main' into claude/mcp-eval-tool More... about 2 months ago
Merge branch 'main' into effects-node/streaming-readwhole-unblocks More... about 2 months ago
nanvm-harness/todo: select a module export, with its API (#2261) More... about 2 months ago
effects/node: say which of the two routes can be given a bound
t
More... about 2 months ago
Merge origin/main into claude/vigilant-lovelace-p13j1z More... about 2 months ago
mcp: eval todo catches throws from the whole pipeline More... about 2 months ago
todo: delete seven issues whose work has shipped (#2283) More... about 2 months ago
Merge remote-tracking branch 'origin/main' into claude/vigilant-lovelace-p13j1z More... about 2 months ago
mcp: todo for a tool that evaluates a module given as text More... about 2 months ago
js/keywords: derive keywords from its groups (#2285) More... about 2 months ago
todo: limit a function's length to 16 and move the arrow factories to types/function (#2282) More... about 2 months ago
todo: re-take the retired-identifier inventory after the moves More... about 2 months ago
todo: correct the grammar, JS, text and media issues against the code More... about 2 months ago
todo: correct the types, Git, CAS and protocol issues against the code More... about 2 months ago
todo: mark the finished resolution and analysis issues as kept records More... about 2 months ago
todo: correct the compiler, EDAG and NaNVM issues against the code More... about 2 months ago
git/oid: isOidOf owns the id-width check (#2281) More... about 2 months ago
todo: correct the top-level issues against the tree More... about 2 months ago
todo: correct the effects, test-runner and CI issues against the code More... about 2 months ago
spec: bring the language drafts up to the compiler More... about 2 months ago
todo: file the code duplication and rule breaches the audit found More... about 2 months ago
todo: file the contributor-doc drift the audit found More... about 2 months ago
todo: retire the implemented expression draft; correct stale spec claims More... about 2 months ago
effects/node: make both todo files agree on what stat-then-read blocks
t
More... about 2 months ago